PROJECTS PHOTOGRAPHS       

Project:


Description:


Year:


Client:

Bridge Over River Indus at Khushal
Garh (Under Construction).


Detailed Design and Construction
Supervision.

2010 - 2011

National Highway Authority,
Islamabad.
Project:


Description:

Year:


Client:


Besham Bridge Over River Indus at
Swat (Under Construction).


Detailed Design.

2011

Flood Restoration Department,
Government of Khyber
Pakhtunkhwa.
Project:


Description:

Year:

Client:
Regent Plaza Intersection at
Sharae Faisal, Karachi.


Vetting and Third Party Review.

2010

City District Government, Karachi.
Project:


Description:


Year:

Client:
Underpass at Shahrah-e-Quaideen
(Khudadad Colony).


Grade Separated Intersection at
Shahrah-e-Quaideen, Karachi.

2010.

City District Government, Karachi.
Project:




Description:


Year:

Client:

Reconstruction of Collapsed
Segment of Shershah Bridge at
Karachi Northern Bypass Project
(KNBP), Karachi.


Detailed Design and Construction
Supervision.

2009 - 2010

National Highway Authority (NHA),
Islamabad.

Project:



Description:



Year:

Client:
Interchange at Jail Chowrangi
(Junction of Shaheed-e-Millat Road,
Kashmir Road and University Road).


Grade Separated Intersection at
Main University Road and
Shaheed-e-Millat Road, Karachi.

2009 - 2010.

City District Government, Karachi.
Project:


Design By:

Vetted By:


Year:

Client:

Bridge Over River Indus at Thakot
on Karakoram Highway.


A. A. Associates, Karachi.

Loya Associates, Karachi.

2008

National Highway Authority,
Islamabad.
Project:



Description:

Year:

Client:

Baba Farid Bridge Over River Sutlej
Connecting Pakpattan with
Minchinabad.

Detailed Design.

2008

National Highway Authority,
Islamabad.

Project:




Description:


Year:

Client:

Bridge Over Malir River Connecting
Shah Faisal Colony with Landhi -
Korangi (Joint Venture: AAA + LA)


Detailed Design and Construction
Supervision.

2006 - 2007

City District Government, Karachi.
Project:



Description:


Year:

Client:
Grade Separated Intersection at
Shahrah-e-Quaideen - Sharea Faisal,
Karachi.


Detailed Design of Structures and
Drawings.

2003 - 2005.

City District Government, Karachi.
Project:



Description:


Year:


Client:
Grade Separated Intersection at
Sharea Faisal - Korangi Road,
Karachi.


Detailed Design of Structures and
Drawings.

2002 - 2004

City District Government Karachi.
Project:


Description:

Year:

Client:
Bridge Over Peshbogi Section
(600 RFT) on Dera Bugti Sui Road.

Detailed Design.

2002

C&W Department, Balochistan.
Project:


Description:


Year:

Client:

Bridge Over Gambila River near
Lakki Town.

Detailed Design and Construction
Supervision.

2002

Frontier Highways Authority,
Peshawar.
Project:


Description:


Year:

Client:
Rashid Minhas Road, Flyover,
Karachi.


Construction Supervision and
Contract Management.

1999

Karachi Development Authority.
Project:


Description:



Year:

Client:

University Road Overhead Bridge,
Karachi.


Design, Bid Evaluation, Contract
Management and Construction
Supervision.

1998

World Bank/
Karachi Development Authority
Project:



Description:



Year:

Client:

Extension/ Reconstruction of Bridge 
Over Lyari River at Rashid Minhas
Road, Karachi.


Design, Bid Evaluation, Contract
Management and Construction
Supervision.

1998

World Bank/ Karachi Development
Authority.
Project:




Description:



Year:

Client:

Babu Sabu Intersection at Pakistan
Motorways (M1) & (M2), Lahore -
Islamabad & Islamabad - Peshawar
500 Kms Motorway.


Approx. 360 Bridges, Flyovers,
Intersections, Structures,
(Outsourcing by DAEWOO - Korea).

1995 - 1998

National Highway Authority,
Islamabad.
Project:



Description:



Year:

Client:

Pakistan Motorways (M1) & (M2),
Lahore - Islamabad & Islamabad -
Peshawar 500 Kms Motorway.


Approx. 360 Bridges, Flyovers,
Intersections, Structures,
(Outsourcing by DAEWOO - Korea).

1995 - 1998

National Highway Authority,
Islamabad.
Project:



Description:



Year:

Client:

Pakistan Motorways (M1) & (M2),
Lahore - Islamabad & Islamabad -
Peshawar, 500 Kms Motorway.

Approx. 360 Bridges, Flyovers,
Intersections, Structures,
(Outsourcing by DAEWOO - Korea).

1995 - 1998

National Highway Authority,
Islamabad.
Project:


Description:

Year:

Client:

Gatani Bridge on N-65
(Quetta - Sibbi Section)

Detailed Design

1994

National Highway Authority,
Balochistan.
Project:


Description:


Year:

Client:

Railway Overhead Bridge at
Wazirabad.


Detailed Design and Construction
Supervision.

1993

National Highway Authority,
Islamabad.
Project:

Description:


Year:

Client:
Pattoki Bridge on N-5

Detailed Design and Construction
Supervision.

1992

C&W Department, Punjab.
Project:


Description:


Year:

Client:
Bridge Over Kech Kaur River
(1500 ft.) Longest in Balochistan.


Detailed Design and Construction
Supervision.

1991

US AID/ Government of Balochistan.
Project:


Description:

Year:

Client:
Bridge Over Hingol River at Liari -
Ormara Road (350 Kms).


Detailed Design

1991

C&W Department, Balochistan.
Project:


Description:



Year:

Client:
Bridge Over Bolan River at Machh,
Bolachistan (600 ft. Long).

Detailed Design, Contact
Management and Construction
Supervision.

1989

C&W Department, Bolachistan.
Project:


Description:




Year:

Client:

Makran Coastal Highway Project

Liari-Ormara Section, Balochistan.

 

248 Kms long 2-Lane Single

Carriageway from N-25, 13.30 m Wide

Paved Track, 37 Bridges & 474

Culverts.

 

2000 - 2006

 

National Highway Authority,
Islamabad.

Project:


Description:




Year:

Client:
Basima - Nag Road Project
(132 Kms) Balochistan


RRCP funded by JBIC, comprises of
132 Kms long, 3.65 m wide pave
Track, 5 New Bridges and 242
Culverts.

1998 - 2003

C& W Department, Balochistan.
Project:


Description:

Year:

Client:

Islamabad Serena Hotel Extension
(5 Star Hotel).


Design and Top Supervision.

1999 - 2001 & 2005 - 2006

Tourism Promotion Services
(Pakistan) Limited.
Project:

Description:



Year:

Client:
Habib Bank Plaza, Karachi.

Seismic Structural Stability
Evaluation and Repair Works of
Facade Elements.

2006 - 2007

Habib Bank Limited, Karachi.
Project:



Description:

Year:

Client:

RMG & Waste Gas Treatment System,
Lucky Cement Plant (Line E&F) at
Karachi.


8400 TPR Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).
Project:


Description:

Year:

Client:

Cement Grinding Unit, Lucky Cement
Plant (Line E & F), at Karachi.


8400 TPD Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).
Project:


Description:

Year:

Client:

Main Store Building, Lucky Cement
Plant (Line E&F) at Karachi.


8400 TPD Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).
Project:


Description:

Year:

Client:

Clinker Cooler and Bag House, Lucky
Cement Plant (Line E&F) at Karachi.


8400 TPD Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).
Project:


Description:

Year:

Client:

Clinker Storage, Lucky Cement Plant
(Line E&F) at Karachi.


8400 TPD Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).
Project:



Description:

Year:

Client:

Raw Material Proportioning Station,
Lucky Cement Plant (Line E&F) at
Karachi.


8400 TPD Cement Plant (Two Lines).

2005 - 2006

Lucky Cement Limited (A Yunus
Brothers Group Project).